» Post Construction Termite Treatment Page ID : WP1220 | Last Updated 12 Nov, 2019, 05:10AM
+91 - 9870276583

Post Construction Termite Treatment Dwarka Delhi

Post Construction Termite Treatment DwarkaTreatment To Masonry Foundation (External Side)

If there is loose soil around the walls of your building, we dig a shovel width trench close to the external wall of the building exposing the foundation wall surface up to a depth of 50cm.
If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300 mm (1ft) apart from each other. Insecticide is then poured, so that it reaches the soil to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
 

Wooden portions of the building are treated:

Further, on all floors, wood work like doors and windows, which are highly susceptible to termite attack are also protected by treatment. Spot treatment of spraying on infested areas in the walls and ceiling is also carried out.


What are the Post Construction Termite Treatment Methods? How to Kill Termites?

Several termite control methods need to be followed based on the type of termite infestation and the level of termite infestation. Four methods are commonly used to get rid of termites, which are written below:

1) Mechanical Alteration/Sanitation Method Of Termite Control: This method of Termite Control is one of the best approaches to prevent or control a termite infestation. Termite can be removed if you follow the following steps:

a) Debris should be removed regularly.
b) Since Termites live in moist environments, so plumbing and roof leaks must be well repaired and maintained.
c) There must be proper ventilation in the crawlspace and add rain gutters, this will be beneficial in resolving moisture conditions.

2) Soil Treatment Method Of Termite Control
Soil Treatment Method of termite control forms a termiticide barrier in the soil in the interior and adjacent parts of buildings. These barriers must be developed inside and outside of the foundation wall or under slabs and around utility entrances.

3) Wood Treatment Method Of Termite Control
Wood treatment method of Termite Control consists of many applications of termiticides directly to the wooden things to kill the existing termite infestations or to make wood resistant against termites. and

4) Foundation Treatment Method Of Termite Control
Foundation treatment method of Termite Control consists of many applications of termiticides to foundation elements. The main purpose of this method of termite treatment is to create a barrier by placing termiticides inside of a concrete block or multiple brick walls where voids exist.

Require a professional solution and Post Construction Termite Treatment Number to your termite treatment from our Pest Control Dwarka Delhi? Call today at +91-9870276583 to take the service from the best Pest Control in Dwarka. 

Request Callback

LATEST NEWS

Best Pest Control Services
Pest Control Dwarka Offer Pest Control Packages for all Pest Control Services. Book a Package as per your convenience & save up to 50% on Pest Control Service Bill. Call : +91-9870276583 for more detail

QUICK CONTACT

 Pest Control Dwarka

+91-9870276583

 Delhi's Pest Control